Specifications & Layout
Current Terminal Capacity: Pier II: 3,2 mil. TEUs- Pier III: 3 mil. TEUs- TOTAL: 6,2 mil. TEUs
Pier II East Side West Side
Operational Quayside 780 meters 700 meters
Depth alongside 14.5 meters 16.5 meters
QC Cranes 9 QCs 8 QCs
RMGs 16 semi – automated RMGs
E-RTGs 22 E-RTGs replaced
Reefer Points 828 reefer plugs for 1090
Throughput 3.2 million TEUs
Pier III East Side West Side
Operational Quayside 600 meters 762 meters
Depth alongside 18.5 meters 19.5 meters
QC Cranes 5 SSPP QCs new generation 26 rows 8 SSPP  QCs new generation 26 rows
RMGs 6 semi – automated RMGs
E-RTGs 24 E-RTGs 
Reefer Points 360 reefer plugs  1035 reefer plugs
Throughput 3 million TEUs
Future Terminal Capacity: Pier II: 3,5 mil. TEUs- Pier III: 3 mil. TEUs- TOTAL: 6,5 mil. TEUs
Pier II East Side West Side
Operational Quayside 780 meters 700 meters
Depth alongside 14.5 meters 16.5 meters
QC Cranes 9 QCs 8 QCs
RMGs 16 semi – automated RMGs
E-RTGs 26 E-RTGs replaced
Reefer Points 760 reefer plugs for 1090
Throughput 3.5 million TEUs
Pier III East Side West Side
Operational Quayside 600 meters 762 meters
Depth alongside 18.5 meters 19.5 meters
QC Cranes 5 SSPP QCs new generation 26 rows 8 SSPP  QCs new generation 26 rows
RMGs 6 semi – automated RMGs
E-RTGs 24 E-RTGs 
Reefer Points 360 reefer plugs  1000 reefer plugs
Throughput 3 million TEUs